A renewable energy plant was experiencing inefficiencies in their atomizers. As lime would build up throughout their piping, a reduction in flow rate was noticed at less than 1 GPM. Looking for a quick and safe solution, RYDLYME was found to be the best tool to return this critical equipment to OEM specification.

A total of 110 gallons of RYDLYME was introduced to the lime slaker system via a 75LDP drum pump. The atomizer was achieving a flow rate of 16GPM in just 30 minutes! The maintenance personnel was astonished!

RYDLYME is now being utilized (monthly) as a preventative maintenance tool and plant personnel are looking for other areas where RYDLYME can be used such as their boilers, scrubbers, condensers and heat exchangers.

CHALLENGE: A waste to energy plant was experiencing inefficiencies in their atomizers.
SOLUTION: A total of 110 gallons of RYDLYME was circulated through the atomizer for only 30 minutes.
RESULTS: The atomizers were returned to OEM specification and producing their design flow of 16GPM! The plant personnel are now utilizing RYDLYME as part of their preventative maintenance program.